Paramount Kaybob Acid Gas Injection Offset Project
5015-8361
The project consists of the installation of an acid gas injection system to replace acid gas flaring and the operation of a sulphur recovery unit, via a Multi-Stage Claus Unit, with fossil fuels. Previously, approximately 1/4 of the acid gas generated at the Kaybob Gas Plant was sent for flaring and 3/4 was sent for sulphur recovery through a Multi-Stage Claus Unit at SemCAMS K3 Plant. In the project condition the capture and permanent sequestration of the entire acid gas stream directly reduces the quantity of CO2 released to the atmosphere. Further, the process of compression, transportation, and injection of acid gas reduces the quantity of GHG emissions released to the atmosphere relative to more GHG intensive baseline processes (i.e. flaring) required for safe disposal of the hydrogen sulphide (H2S) contained within the acid gas stream. As the activities of the project are applicable under the Quantification Protocol for Acid Gas Injection and AGI is not an industry standard, the results of this project are considered additional and would not have occurred under business as usual circumstances.
Acid Gas Injection
None defined
The following is a Google Maps feature that may not be accessible for all users. For assistance with location information, please contact: [email protected]
2010-10-07
2018-10-06
Closed
26
165,607
23,092
Emission Offsets Summary
32,402
Active
0
Pending Retirement
0
Retired
32,402
Total 
Emission Offsets
Serial RangesTypeLabel
Vintage
Year
Current Company NameStatus
Expiry Date
Total 
(t CO2 e)
5015-8361-000-028-880-854 to
5015-8361-000-028-913-255
2018
ENMAX Energy Corporation
Active
2027-07-05
32,402