McBride Lake Offset Project Phase 1
6703-4605
The McBride Lake Offset Project Phase 1 (the Project) converts Renewable Energy Certificates, generated at McBride Lake wind farm (the Facility), an Ecologo certified wind-power electrical generation facility, from 2003 to 2007. The Project has been developed in accordance with Alberta Environment's Project Guidance Document, Project Verification Document and Quantification Protocol for Wind-Powered Electricity Generation. MWh of generation available for offset conversion are the net MWh available after reductions for on-site load and commercial and residential sales of the environmental attributes (including greenhouse gas reductions) associated with generation. Only eligible MWhs have been converted to offsets. Unsold or otherwise unallocated inventories of Renewable Energy Certificates from the Facility during the 2003 to 2007 period are converted to Offsets at the Emissions Intensity Factor of 0.65 tonnes CO2e / MWh, as set out in Alberta Environment's Project Guidance Document.
Wind-Powered Electricity Generation
None defined
The site is located approximately 10 km south of Fort MacLeod, Alberta, Canada on the west side of Secondary Road 810, west of Blue Trail and north of Township Road 74 in the M.D. of Willow Creek, Alberta.
The following is a Google Maps feature that may not be accessible for all users. For assistance with location information, please contact: [email protected]
2003-02-09
2015-02-09
Closed
31
219,702
43,940
Emission Offsets Summary
0
Active
0
Pending Retirement
0
Retired
0
Total 
Emission Offsets
Serial RangesTypeLabel
Vintage
Year
Current Company NameStatus
Expiry Date
Total 
(t CO2 e)
There are no emission offsets for this project that have been serialized. Please contact the project developer or authorized project contact.