Ghost Pine Wind Power Project
4852-9626
The Ghost Pine Wind Electricity Facility is located in Kneehill Country, Alberta, generates electricity from wind, and connects to the Alberta Integrated Electricity System. The project results in a reduction of indirect GHG emissions related to the generation of electricity in the province of Alberta through the displacement of grid electricity with renewable, wind-powered electricity generation.
Wind-Powered Electricity Generation
None defined
The Ghost Pine Wind Power Plan is located on the following lands located in Kneehill County, Alberta:<br />
Sections 25, 26, 30, 31, 34, and 35 Township 33, range 24, West of the 4th Meridian;<br />

Section 3, 5, 8-10, 15, 18, 19, 22, and 27, Township 34, Range 24, West of the 4th Meridian; and<br />

Sections 2, 11, 14, and 23, Township 34, Range 25, West of the 4th Meridian<br />

The following is a Google Maps feature that may not be accessible for all users. For assistance with location information, please contact: [email protected]
2011-01-01
2023-12-31
Closed
38
1,320,000
165,000
Emission Offsets Summary
10,029
Active
202,825
Pending Retirement
0
Retired
212,854
Total 
Emission Offsets
Serial RangesTypeLabel
Vintage
Year
Current Company NameStatus
Expiry Date
Total 
(t CO2 e)
4852-9626-000-034-188-005 to
4852-9626-000-034-278-004
2019
TransAlta Generation Partnership
Pending Retirement
2028-07-05
90,000
4852-9626-000-034-278-005 to
4852-9626-000-034-288-033
2019
TransAlta Energy Marketing Corp.
Active
2028-07-05
10,029
4852-9626-000-029-026-296 to
4852-9626-000-029-096-295
2018
Capital Power LP
Pending Retirement
2027-07-05
70,000
4852-9626-000-029-096-296 to
4852-9626-000-029-116-146
2018
Imperial Oil Resources Ltd.
Pending Retirement
2027-07-05
19,851
4852-9626-000-030-292-128 to
4852-9626-000-030-313-621
2018
Imperial Oil Resources Ltd.
Pending Retirement
2027-07-05
21,494
4852-9626-000-030-313-622 to
4852-9626-000-030-315-101
2018
Capital Power (G3) Limited Partnership
Pending Retirement
2027-07-05
1,480