Ember Resources Instrument Air Conversion Aggregation Project Phase 2
The objective of the project is to reduce greenhouse gas emissions from three (3) natural gas processing and compression facilities owned and operated by Encana Corporation. The project reduces GHG emissions through the installation of instrument air compressors and related infrastructure to retrofit existing gas processing and compression facilities that previously relied on natural gas-driven pneumatic instrumentation systems for process control. The use of compressed air to operate these pneumatic systems eliminated the venting of natural gas (primarily methane) that occurred in the baseline scenario from the use of pressurized natural gas to operate the pneumatic instrumentation systems
Instrument Gas Conversion to Instrument Air Conversion in Process Control Systems
None defined
Aggregated project. Spatial template locator to be submitted. All facilities are in Alberta and locations are at 13-27-031-25W4, 08-34-029-22W4 , 13-33-033-20W4.
The following is a Google Maps feature that may not be accessible for all users. For assistance with location information, please contact: [email protected] 2013-06-11
2021-06-10
36,000
4,500