Apache Zama Battery 12 Enhanced Oil Recovery Project
The project is an enhanced oil recovery (EOR) project in northwest Alberta. Prior to EOR, carbon dioxide in acid gas associated with the produced gas was processed through sulphur recovery and incineration at the nearby Zama Gas Plant. This process resulted in emissions from combusion of the acid gas, combustion of fuel gas added to the incinerator to ensure proper combustion and formation CO2 venting from the incinerator stack. These sources are eliminated by the project's implementation.
Enhanced Oil Recovery (streamlined)
The Apache Zama Battery 12 Enhanced Oil Recovery (EOR) Project is located in the north-western corner of teh province of Alberta, approximately 875 km (550 miles) northwest of Edmonton. EOR is ongoing in multiple pools within the oil reservoir, but the recovered oil flows to the oil battery (14-12-16-06-W6), therefore the battery location is used for this project.
The following is a Google Maps feature that may not be accessible for all users. For assistance with location information, please contact: [email protected] 2004-12-01
2017-11-30
680,854
85,100
| There are no emission offsets for this project that have been serialized. Please contact the project developer or authorized project contact. |
Contact
,
View Project's address on Map