AltaGas Turin Acid Gas Injection Project
6878-6600
The Turin sour gas processing plant, operated by AltaGas Processing Partnership, is a sour gas processing facility with a licensed capacity of 44 mmscf/d. The plant consists of inlet separation, approximately 3,200 horsepower of inlet compression, a sweetening train and a refrigeration system. The emission reductions contemplated under this report are relative to the back-end treatment and disposal of the acid gas stream generated as a result of the processing of the hydrocarbon feedstock at the facility
Acid Gas Injection
None defined
The formation being injected into is called the Mannville Y Pool.  This reservoir contains 5 completed wells.<br>
These wells include:<br>
00/01-14-012-19W4/0 - non-producing<br>
02/01-14-012-19W4/0 - non-producing<br>
00/03-25-012-19W4/0 - injection well<br>
00/14-13-012-10W4/2 - producing gas well shut in March 2007 <br>
00/06-24-012-19W4/0 - producing gas well shut in March 2006<br>
The following is a Google Maps feature that may not be accessible for all users. For assistance with location information, please contact: [email protected]
2005-01-01
2017-12-31
Closed
35
800,000
100,000
Emission Offsets Summary
0
Active
0
Pending Retirement
0
Retired
0
Total 
Emission Offsets
Serial RangesTypeLabel
Vintage
Year
Current Company NameStatus
Expiry Date
Total 
(t CO2 e)
There are no emission offsets for this project that have been serialized. Please contact the project developer or authorized project contact.